9th & Tippecanoe Warehouse

9TH & TIPPECANOE WAREHOUSE

San Bernardino, California

OWNER:
Oakmont Industrial Group

DESCRIPTION:
Located on a ±14.3-acre site, this one-story concrete tilt-up warehouse totals ±337,000 SF. The building includes ±3,500 SF of ground-floor office, ±333,500 SF of warehouse area, 29 dock-high doors, 2 grade-level doors, and 28 truck trailer storage spaces.


Transportation/Distribution Yard & Office/Maint. Building

Transportation/Distribution Yard & Office/Maint. Building

San Bernardino, California

OWNER:
Dedeaux Properties

DESCRIPTION:
Located on a ±6.8-acre site, this one-story CMU building functions as a truck maintenance facility and totals approximately 8,375 SF. The building includes 2,350 SF of ground-floor office, 3,650 SF of vehicle repair/garage space, 2,375 SF of mezzanine storage, 3 grade-level doors, and 161 truck trailer stalls.


Signal Hill Business Park

Signal Hill Business Park

Signal Hill, California

CLIENT:
Xebec Realty Partners

DESCRIPTION:
153,000 SF Industrial Business Park with 9 buildings ranging from 7,650 SF to 27,500 SF on an 8.37 acre site.  Buildings will be demised into individual suites for sale with office and warehouse area and grade level doors.

23' of grade across the site was accomodated with creative planning.

Download PDF

8888 Balboa Avenue Warehouse

8888 balboa avenue warehouse

San Diego, California

CLIENT:
Rexford Industrial

DESCRIPTION:
This project consists of a speculative shell concrete tilt-up industrial building on an approximate 5.56 acre site. The total building footprint is about 117,804 SF; 111,052 SF for warehouse and 12,000 SF for office. With plenty of space for designated parking, allowable space for 22 dock doors, 2 grade doors, and 6 trailer stalls is achieved.

Watson Industrial Center – Building 145

Watson Industrial Center – Building 145

Carson, California

CLIENT:
Watson Land Company

DESCRIPTION:
Exterior facade and landscape renovation of a 108,000 sf industrial building, furthering the useful life of an out-of-date but still functional building.

A completely new, modern look achieved while preserving the primary structure.

Download PDF