Lighting Upgrades

Lighting upgrades

Southern California

CLIENT:
Confidential

DESCRIPTION:
This image is not an actual project. It is a computer-generated illustration intended solely to represent the general nature of the work and does not reflect any specific site conditions, design, or client. No confidential or proprietary information was used in its creation.

The Colonies Marketplace Building "C"

The Colonies Marketplace Building "C"

Ontario, California

CLIENT:
M&M Development Group, LLC

DESCRIPTION:
This speculative retail building is the latest addition to The Colonies Marketplace, a neighborhood retail center designed by GAA Architects. The award-winning center, anchored by Walgreens and Fresh & Easy, totals 36,300 square feet on a 4.1-acre site.

Originally planned as a future pad, GAA was later commissioned to design Building “C,” which includes seven tenant spaces, one accommodating restaurant use, and an integrated courtyard that serves as a shared outdoor amenity.

Folding Glass Wind Screen

Folding Glass Wind Screen

Southern California

CLIENT:
Confidential

DESCRIPTION:
This image is not an actual project. It is a computer-generated illustration intended solely to represent the general nature of the work and does not reflect any specific site conditions, design, or client. No confidential or proprietary information was used in its creation.

Staff Roof Access Stair

Staff Roof Access Stair

Southern California

CLIENT:
Confidential

DESCRIPTION:
This image is not an actual project. It is a computer-generated illustration intended solely to represent the general nature of the work and does not reflect any specific site conditions, design, or client. No confidential or proprietary information was used in its creation.

County Operations Center Parking Structure B2

COUNTY OPERATIONS CENTER PARKING STRUCTURE B2

San Diego, California

CLIENT:
City of San Diego

DESCRIPTION:
This seven-level, 577,000 SF cast-in-place parking structure provides 1,820 stalls for the County of San Diego Operations Center, combining efficient long-span post-tensioned construction with durable and sustainable design elements.

Developed as a design-build project, the structure incorporates ductile framing, precast concrete cladding along the west elevation, and perforated metal screens that provide natural ventilation and visual texture. A separate masonry and glass-clad stair and elevator tower anchors vertical circulation, while rooftop solar canopies offer shade for vehicles and contribute to on-site energy generation.

Winner of a County-sponsored design-build competition. Completed by Parking Design Solutions, a GAA joint venture.

Office & Talent Dressing Room TI

Office & Talent Dressing Room TI

Southern California

CLIENT:
Confidential

DESCRIPTION:
This image is not an actual project. It is a computer-generated illustration intended solely to represent the general nature of the work and does not reflect any specific site conditions, design, or client. No confidential or proprietary information was used in its creation.

Maintenence Department Vertical Lifts

Maintenence Department Vertical Lifts

Southern California

CLIENT:
Confidential

DESCRIPTION:
This image is not an actual project. It is a computer-generated illustration intended solely to represent the general nature of the work and does not reflect any specific site conditions, design, or client. No confidential or proprietary information was used in its creation.

Central Air Compressor Replacement

Central Air Compressor Replacement

Southern California

CLIENT:
Confidential

DESCRIPTION:
This image is not an actual project. It is a computer-generated illustration intended solely to represent the general nature of the work and does not reflect any specific site conditions, design, or client. No confidential or proprietary information was used in its creation.