Main

American Way

american way

Orange, California

CLIENT:
Rexford Industrial

DESCRIPTION:
This project consists of two speculative shell concrete tilt-up industrial buildings, totaling a combined building area of approximately 101,000 SF on a 4-acre site. Each building provides an approximate 4,000 SF ground floor tenant improvement office with 4,000 SF mezzanine.

Brea Canyon Business Park

Brea Canyon Business Park

Diamond Bar, California

CLIENT:
Executive Development

DESCRIPTION:
This 47,650 SF office condominium project—designed for a 50/50 mix of medical and professional use—is located on a master-planned 5.67-acre triangular site in Diamond Bar. Bordered by the LA County Flood Control Channel, residential neighborhoods, and a nearby freeway, the site also includes designated pads for future retail and hotel development.

A shared parking agreement allowed for reduced on-site parking, maximizing use of the constrained site. The three-story concrete tilt-up structure utilizes a Special Ductile Moment Frame (SMF), which minimized foundation requirements, eliminated the need for core shear walls, and enabled a more generous glass line. Acoustic glass was incorporated due to the building’s proximity—approximately 26 feet—to the adjacent freeway overpass.

This marks GAA’s third three-story tilt-up office building in Diamond Bar.

Extron Experience Center

Extron Experience Center

Las Vegas, Nevada

CLIENT:
Extron Electronics

DESCRIPTION:
3,645 SF Interior Tenant Improvement at Hughes Center. This facility houses an engaging product demonstration area filled with the latest in Extron technologies deployed in a variety of environments along with a state-of-the-art presentation area. The layout consists of a high-performance demo and presentation flex-space designed to reflect Extron’s identity as a leader in AV technology.

 

Azusa Avenue Industrial Building

Azusa Avenue Industrial Building

City of Industry, California

CLIENT:
Donlon Builders

DESCRIPTION:
Located on a ±4-acre site, this concrete tilt-up warehouse totals approximately 89,000 SF. The building includes a 3-level Tenant Improvement totaling ±13,000 SF of office space, ±70,000 SF of warehouse area that includes ±11,00 sf of cold storage, and a ±5,000 covered loading area that is internal to the building.

Finish Line Auto Club

Finish Line Auto Club

Palm Desert, California

CLIENT:
Finish Line Auto Club

DESCRIPTION:
This luxury collector-car facility offers individually owned garage condos that combine secure vehicle storage with customizable display space for cars, art, and personal collections. The project includes 91,000 SF of vehicle storage, 22,000 SF of mezzanine/condos, 3,000 SF of auto retail, 5,000 SF of office, and a 6,000 SF owner’s lounge that serves as the social center of the community—totaling approximately 127,000 SF of premium storage and amenities.

Sierra Business Park

Sierra Business Park

Fontana, California

CLIENT:
LNR Property Corporation

Oakmont Industrial Group

Sares Regis Group

DESCRIPTION:
A fourteen building distribution complex totaling nearly 4.8 million square feet on 202 acres. Building design range from twin 32 feet clear, 1.1 million square feet cross-dock facilities down to 24 feet clear, 14,000 square feet facilities, including Build-to-Suits for Tireco Inc., American Sporting Goods Corp., and Hagen Inc.

Download PDF

8888 Balboa Avenue Warehouse

8888 balboa avenue warehouse

San Diego, California

CLIENT:
Rexford Industrial

DESCRIPTION:
This project consists of a speculative shell concrete tilt-up industrial building on an approximate 5.56 acre site. The total building footprint is about 117,804 SF; 111,052 SF for warehouse and 12,000 SF for office. With plenty of space for designated parking, allowable space for 22 dock doors, 2 grade doors, and 6 trailer stalls is achieved.

Newport Beach City Hall Parking Structure

Newport Beach City Hall Parking Structure

Newport Beach, California

CLIENT:
City of Newport Beach / Bomel Construction

DESCRIPTION:
Part of the Newport Beach Civic Center and Park master plan, this 450-car, four-level structure is integrated into the site’s topography to preserve ocean views and minimize visual impact. It forms an open courtyard with the adjacent Civic Center, serving both public and staff parking while complementing the campus architecture.

Designed with Bohlin Cywinski Jackson Architects and completed by Parking Design Solutions, a GAA joint venture, the structure features vertical metal fins, open-air circulation, and landscaped edges that enhance functionality and aesthetics.

Download PDF