Recreational Center

RECREATIONAL CENTER

City of Industry, California

CLIENT:
Donlon Builders

DESCRIPTION:
A recreational center located in the City of Industry on an approximate 5.74-acre site. At approximately 40,000 SF, the recreational center includes two basketball courts with adjacent pullout bleachers, three boxing rings with adjacent pullout bleachers, and designated area for offices, a multi-purpose room, and restrooms. Alongside the recreational center area two existing parking lots.

Download PDF

Midtown Crossing

MIDTOWN CROSSING

Los Angeles, California

CLIENT:
CIM Group / HW&A Structures

DESCRIPTION:
A 1,070 car, three-tier parking structure which serves as a backbone and podium for a new retail center on an urban infill site.

Designed in collaboration with P&R Architects. Completed by Parking Design Solutions, a GAA joint venture.

Westfield Century City Parking Structure

WESTFIELD CENTURY CITY PARKING STRUCTURE

Century City, California

CLIENT:
Westfield Group / Largo Concrete

DESCRIPTION:
This 561 stall parking structure has two basement levels and four elevated decks, totaling to 206,900 square feet.

Award winning facade features shimmering metal tiles facing adjacent residential. Completed by Parking Design Solutions, a GAA joint venture.

Download PDF

The Source Shopping Center Parking Structure

THE SOURCE SHOPPING CENTER PARKING STRUCTURE

Buena Park, California

CLIENT:
M&D Properties / Klorman Construction

DESCRIPTION:
1,716 stall, 6-level parking structure with an animated facade complimenting the cutting-edge shopping center.

Completed by Parking Design Solutions, a GAA joint venture.

Download PDF

Toyota of West Covina

TOYOTA OF WEST COVINA

West Covina, California

CLIENT:
Toyota of West Covina / Parking Structure Builders, Inc.

DESCRIPTION:
Design for a new Toyota dealership consisting of a 4-level parking structure with a 90,000 square foot showroom/sales area and basement level service bays.

Download PDF

County Operations Center Parking Structure B

COUNTY OPERATIONS CENTER PARKING STRUCTURE B

San Diego, California

CLIENT:
City of San Diego

DESCRIPTION:
This 1,820 car, seven-tier, cast-in-place long-span parking structure features roof-top solar panels, ductile frames, precast concrete cladding, and perforated metal screens.

Winner of a County-sponsored design-build competition. Completed by Parking Design Solutions, a GAA joint venture.

Download PDF

Extron Electronics World-Wide Corporate Headquarters Interiors

Extron Electronics World-Wide Corporate Headquarters

Anaheim, California

CLIENT:
ACE Anaheim Building, LLC

DESCRIPTION:
Six-story 200,000 quare feet high-rise corporate headquarters including 20,000 square feet ground level restaurant/ live entertainment venue and 30,000 square feet sixth floor banquet facility. Corporate office tenant improvements include training rooms, data center, labs, product demonstration rooms, video and photo studios and video conference rooms.

Rooftop air-cooled chillers create 2,200 kWh of stored ice for use during daytime peak rates.

 
Download PDF

Prime Healthcare Services Headquarters

Prime Healthcare Services Headquarters

Ontario, California

CLIENT:
HMC Construction Inc.

DESCRIPTION:
This three-story 79,000 square feet office building is similar to the client's adjacent building designed by GAA over 10 years earlier. The new building features elevator access to the roof-top helipad, executive offices, board room, and administrative offices.

The tilt-up concrete ductile frame design reduced foundation and detailing costs while enabling additional glass area.

Download PDF