CBS Studio Center Parking Structure

CBS Studio Center Parking Structure

Studio City, California

CLIENT:
CBS Studio Center

DESCRIPTION:
1200 car parking structure on a studio lot, designed for efficiency and to satisfy concerns of adjacent residents.

Completed while at Project Manager at another firm.

Download PDF

Travis Ranch K-8 School and Activity Center

Travis Ranch K-8 School and Activity Center

Yorba Linda, California

CLIENT:
Placentia Unified School District

DESCRIPTION:
A 94,700 square feet, two-level K-8 school for Placentia USD, including classrooms, special education classrooms, information center, child-care center, community activity center, auditorium/gymnasium, fine arts facility, and a vivarium for raising animals and plants indoors.

Download PDF

Engineering Laboratories Replacement

Engineering Laboratories Replacement

California State Polytechnic University, California

CLIENT:
California State Polytechnic University

DESCRIPTION:
Concept Design through Design Development services phase for a new two story 105,000 square foot Engineering Laboratory building.

Completed while at EHRLICH-ROMINGER.

Download PDF

United States Post Office

United States Post Office

Dana Point, California

CLIENT:
United States Post Office

DESCRIPTION:
Taking it's design que from the surrounding context, this 20,500 square feet facility and yard located in this seaside community has a Cape Cod influence including gabled roofs with dormer windows, a blue and gray color scheme, and a two-story lobby.

 
Download PDF

Oso Viejo Community - Senior Center

Oso Viejo Community - Senior Center

Mission Viejo, California

CLIENT:
San Clemente Seniors/The City of Mission Viejo

DESCRIPTION:
A 10,000 square feet multi-purpose public facility located in the 35-acre Oso Viejo Park. The facility created three separate functions: a community wing with administration, meeting rooms, central lounge senior wing, and an auditorium with complete kitchen facilities.

 
Download PDF

UPS Sort and Load Facility

UPS Sort and Load Facility

Long Beach, California

CLIENT:
United Parcel Service

DESCRIPTION:
United Parcel Service mail and sorting facility and aircraft ramp on the southeast side of Long Beach Airport. The project site is 8.2 acres with a 6,000 square foot sort recovery building, 5,200 square foot administrative building and aircraft ramp for three B737-400 aircraft.

Completed while at HMTB Company.

 
Download PDF

Crenshaw Christian Center Expansion

Crenshaw Christian Center Expansion

Los Angeles, California

CLIENT:
Crenshaw Christian Center

DESCRIPTION:
Addition and remodel to create a 19,500 square feet multi-purpose facility including a gymnasium/auditorium, classrooms, exercise room, game room, dance room, locker rooms, and common facilities.

Download PDF

Plant 42, Hangar 51 Renovation

Plant 42, Hangar 51 Renovation

Palmdale, California

CLIENT:
Northrop Grumman

DESCRIPTION:
Renovation of an existing 250,000 square feet maintenance hangar with offices and shop facilities for use in making modifications to B-2 Bombers.

Completed while at Sverdrup Facilities.

 
Download PDF