Confidential Electric Car Factory

CONFIDENTIAL ELECTRIC CAR FACTORY

Confidential, California

CLIENT:
Confidential

DESCRIPTION:
Interior industrial tenant improvement for an automobile factory spanning approximately 1,000,000 square feet.

Download PDF

Dixie State College Sound Stage

DIXIE STATE COLLEGE SOUND STAGE

Saint George, Utah

CLIENT:
Dixie Direct & Dallas Allen Entertainment

DESCRIPTION:
Conceptual design of a 10,000 tilt-up sound stage with 35-foot clear height. The sound stage is designed with wood bowstring trusses and two 17’-8” wide by 16’ tall rolling concrete doors. The stage also features 80 tons of “quiet cool” air and 1000 KVA service for 4500 Amps lighting power at 120V single phase.

Download PDF

Confidential Studio Parking Structure

CONFIDENTIAL STUDIO PARKING STRUCTURE

California

CLIENT:
Confidential

DESCRIPTION:
An approximate 500 car parking structure with a 20’ clear grip and lighting warehouse with potential for possible basement level.

Completed with Parking Design Solutions, a GAA joint venture.

Download PDF

Los Angeles Center Studios

Los Angeles Center Studios

Los Angeles, California

CLIENT:
Los Angeles Center Studios

DESCRIPTION:
The first film and television studio to be built in downtown Los Angeles in 60 years with six NC25 sound stages and four production support buildings totaling 142,000 square feet on a sloped 4-acre site with zero lot lines.

Completed while Project Manager at another firm.

Download PDF

Manhattan Beach Studios

Manhattan Beach Studios

Manhattan Beach, California

CLIENT:
Shamrock Holdings, LLC

DEVELOPER:
Flesch & Neuhauser, LLC

DESCRIPTION:
The first new studio built from the ground up in sixty years in Southern California, comprised of (14) state-of-the-art sound stages, production support offices, mill, shops, storage, commissary and parking structure totaling over 800,000 square feet.

Completed while Project Manager at another firm.

Download PDF